We specialise in the careful relocation of IT infrastructure for . From single workstations to full server room moves, every piece of kit is logged, padded and transported to a written brief. We coordinate directly with your IT team or third-party contractor so systems are down for the shortest window possible and back online on schedule.
Every IT relocation job we run is scoped around the specific kit your business depends on. Common items include:
If it powers your business and it needs to move, we handle it. We run and cover all areas from the to , , and . and tell us what you are moving and we will come back with a clear scope.
We handle the physical disconnection, transport and repositioning of all IT equipment. Reconnection and configuration is coordinated with your in-house IT team or your third-party IT contractor. We plan the power-down and power-up windows with them in advance so nothing is plugged back in before it is ready.
Yes. Server room and comms room moves are planned as overnight or weekend jobs to keep disruption off trading hours. We move equipment last in, first out so your core infrastructure is the last thing packed and the first thing repositioned at the new site. Rack layouts, cable labelling and floor plans are agreed with your IT team before move day. For larger moves spanning multiple floors or sites, see our .
Every item is logged against an asset list before it leaves the building. Servers, rack units and network hardware are padded with IT-grade foam and blankets, secured in crates and transported in vehicles with load restraints. We do not stack IT equipment and we do not share loads with general on the same run.
Yes. Every item is tagged and logged at collection and signed off at delivery. The chain of custody record is handed to your IT lead or facilities manager at completion. This is standard on all our IT relocation jobs, and particularly useful for legal, financial and healthcare clients with asset management obligations. if you have specific compliance requirements and we will confirm how we handle them.
Yes. We build the move schedule around your cutover window, not ours. If your IT team has a confirmed maintenance slot, we time the physical move to land equipment at the destination before that window opens so your team can start reconnection on schedule. We confirm the timeline in writing with both your facilities contact and your IT lead before move day. and include your cutover date so we can scope around it from the start.

Email
[email protected]
Call Us
0203 0895 535